Recovery Hair Mask
Hallstar Italia Srl
Preparation:
Procedure Prepare phase A and phase B separately. Heat to 75°C–80°C. At 75°C, add phase B to phase A under agitation, using a suitable dispersion unit (e.g., Silverson, Ultra Turrax). Homogenize for a few minutes, then cool under gentle stirring. Add C when AB is at 40°C. Mix until uniform and at desired filling temperature.Notes:
Properties (25°C) Appearance: White shiny cream Viscosity (20 rpm, Brk, RVDV-E, Sp 4, after 24 hours at room temperature, mPa∙s): 3000–7000 pH (100%): 3.5–4.0 *Patented and patent pendingDisclaimer
While every effort has been made to reproduce these formulations correctly, the Publisher of this website cannot accept any liability for the information presented. All formulations are provided in good faith, but no warranty is given as to accuracy of information or results, or suitability for a particular use, nor is freedom from patent infringement to be inferred. Formulations are offered solely for consideration by the participating manufacturers. Continued use of this web site infers acceptance of this disclaimer.
Latest Issues
World leader in the engineering of natural active ingredients
A French independent company, SILAB has been recognized for its expertise in skin biology and in mastering plants and biotechnologies for 40 years. It provides patented active ingredients with proven efficacy and safety, intended for major names in global cosmetic and dermo-cosmetic...
NYSCC Suppliers' Day 2025
Javits Center, New York
3rd - 4th June 2025
17th Sun Protection Conference 2025
Royal College of Physicians, London
24 - 25 June 2025